TRAFFIC ALERT: Road Closure on North Douglas Fir Drive

Road closure on North Douglas Fir Drive

START DATE: 7/22/2022 END DATE: 8/19/2022

Due to a water main repair and ongoing soil stabilization on a section of North Douglas Fir Drive, a section of North Douglas Fir Drive is closed to thru traffic.  Access to the mailbox cluster located on the north side of the road is being maintained and is accessible from the east.

Once the soil stabilization has been completed, a section of curbing and sidewalk will be replaced to the correct grade. The affected section of pavement will be repaved to provide positive drainage.

For your safety and that of the contractor’s personnel, please comply with traffic control devices, flagging personnel, and/or detour signs. Travel time through the project area may increase during construction so please adjust your schedule accordingly. Construction may restrict traffic lanes and create congestion. Taking alternate routes is suggested.

If inclement weather or other events cause delays, the work may be rescheduled without further notice.

Stay up-to-date on Town of Marana news, projects, and events. Visit MaranaAZ.gov, like us on Facebook, and follow us on Twitter.