PROJECTS

 

CAMINO MARTIN/JEREMY PLACE RESTORATION - 2016

Pavement Restoration and drainage repair, from Ina Road to southern boundary.

CONTINENTAL RANCH 12A-B, RESTORATION - 2016

Pavement restoration and ADA upgrades in the Continental Ranch 12A-B subdivisions.

CRACKER BARREL ROAD PAVEMENT RECONSTRUCTION - 2016

Pavement reconstruction and storm drain improvements.

INA ROAD AND BRIDGE, SILVERBELL ROAD TO I-10 - 2016 (BY OTHERS)

Widen Ina Road between Silverbell Road and Star Commerce Drive to a 4-lane section with raised median, sidewalks and drainage improvements. Removal of the existing Ina bridge over the Santa Cruz River and replace with two new 2-lane bridges.

INA ROAD RIGHT TURNBAY ONTO THORNYDALE - 2016

Redesign of the right turnbays at the intersection of Ina Road and Thornydale Road. Project will include wider right turn lanes and designated bicycle through lanes.

ORA MAE HARN PARK BALLFIELD IMPROVEMENTS - 2016

Replace backstops, dugouts, and fencing on 5 ball fields at Ora Mae Harn Park. Enlarge adult softball field to 300', install new lighting on 1 field, replace restroom, improve irrigation, field turf, and associated landscape. Fiscal years 2016 - 2018.

ORA MAE HARN PARK PARKING RECONSTRUCTION - 2016

Ora Mae Harn Park parking lot reconstruction with drainage improvements and access road repairs. 

SANTA CRUZ SHARED USE PATH, EL RIO TO AVRA VALLEY - 2016

Construct a 14' shared use path from El Rio Park to Avra Valley Road approx 1.45 miles with 5 drainage crossings. Project coincides with development of Pima County Anza Trailhead at Coachline Blvd.

SANTA CRUZ SHARED USE PATH, PHASE III - 2016

The proposed project is a 2.7 mile long, 14’ multi-use path running from Gladden Farms Park to the Cemex Concrete plant, running along the northeastern bank of the Santa Cruz River.  

TANGERINE CORRIDOR COMMUNITY PARK - 2016

Design and construct a community park with multi-use field, courts, shaded play area, ramadas, perimeter path, parking, restroom, security lighting, and associated amenities.

TANGERINE ROAD I-10 TO LA CANADA - 2016

From I-10 to La Canada, widen Tangerine Rd to 4 lanes with raised medians, drainage improvements, sidewalks, ADA facilities, multi-use path and lanes, traffic signals, right-of-way acquisitions, utility relocations, and wildlife crossing structures.

TWIN PEAKS ROAD SHARED USE PATH ACCESS - 2016

Design and construction of three access points to connect multi-use lanes along Twin Peaks Road to regional and local shared-use path systems.

INA ROAD RIGHT TURNBAY TO OLDFATHER ROAD - 2017

Project consists of modifications to Ina Road approaching its intersection with Oldfather road to create a designated right turn lane from westbound Ina Road onto northbound Oldfather Road. 

MARANA PUBLIC SAFETY FACILITY - 2017

Design and construct an approximately 55,000 sq. ft. public safety facility at the Marana Municipal Complex. Project will include parking lots, access improvements, and landscaping.

AERIE DRIVE PAVEMENT RESTORATION - 2018

Pavement restoration and ADA upgrades on Aerie Drive.

COACHLINE ROAD RECONSTRUCTION - 2018

Pavement Restoration of all Coachline Blvd.

INA ROAD PAVEMENT RESTORATION - 2018

Pavement restoration, ADA upgrades and sidewalk infill on Ina Road from Camino de Oeste to Meredith Blvd. Project will also include pavement restoration of adjacent roads from Ina Road to north Town limits.

AVRA VALLEY ROAD PAVEMENT RECONSTRUCTION - 2019

Pavement reconstruction from Sanders Road to the western Town limits.

CAMINO DE OESTE, THORYNDALE WIDENING - 2019

On Camino De Oeste, Rain Cloud to Moore Road, widen existing roadway to accommodate bicycle traffic.

On Thorydale Rd. Tangerine Crossing to Moore Road, widen existing roadway to accommodate bicycle traffic.

SILVERBELL ROAD SIDEWALK, TWIN PEAKS TO COACHLINE - 2019

Construct a concrete sidewalk along the west side of Silverbell Road between Twin Peaks Road and Coachline Boulevard.

GLADDEN FARMS RoaD - RECONSTRUCTION - 2020

Gladden Farms Road pavement reconstruction and ADA ramp upgrades from Lon Adams to Tangerine Farms. 

Arizona PAVILIONS AND WALMART SIGNAL - 2021

Install a 4-way signalized intersection at Arizona Pavilions and Walmart parking lot entrance.