The Town of Marana is seeking artists to enrich our public spaces.
Town of Marana seeks to fill two seats on the new Public Art Review Committee
Traffic Alert: Ina Beautification
Southern Arizona Paving, in conjunction with the Town of Marana, will be installing monuments in the median at each end of the boundaries of the Ina Road Beautification project beginning Monday, June 17th and ending by Wednesday, June 19th. Traffic lanes next to the median will be closed in each direction of travel at both locations.
One monument is located west of Ulene Place and the other monument is on the west side of the Canyon Del Oro Wash Bridge. Work hours are from 6:00 AM to 5:00 PM.
For your safety and that of the contractor’s personnel, please comply with traffic control devices, flagging personnel, and/or detour signs.
Travel time through the project area may increase during construction so please adjust your schedule accordingly. Construction will restrict traffic lanes and may create congestion. Taking alternate routes is suggested.
For your safety and that of the contractor’s personnel, please comply with traffic control devices, flagging personnel, and/or detour signs.
If inclement weather or other events cause delays, the work may be rescheduled without further notice.
Stay up-to-date on Town of Marana news, projects, and events. Visit MaranaAZ.gov, like us on Facebook, and follow us on Twitter.
Marana looking for artist for roundabout
The Town of Marana has been awarded grant funding through the Pima Association of Governments (PAG) Transportation Art by Youth (TABY) program to fund a public art project for the Downtown Marana/Marana Main Street Gateway. The Town is soliciting qualifications from artist for the design, construction, and installation of the public art project. The Artist will work with the Town’s representative to develop the design and construction of the art to be installed at the Marana Road roundabout.
As the future location of the Town’s planned Downtown Marana and Marana Main Street area, this public art will feature a modern design in a simultaneous effort to acts as a visual centerpiece and gateway to the Town’s Downtown/Main Street area.
The intended design should incorporate the following:
Be clean and forward-looking in design
If possible, refer to aspects of Marana’s heritage and natural environment
Be conscious of the surrounding area’s overall vision for downtown Marana
Be mindful of sight distances for traffic safety reasons
Take advantage of the concentric nature of the roundabout, potentially utilizing a 360 degree view
Complement the established materials board used for the landscape architecture piece included in the roundabout – See separate Attachment ‘A’ Landscape Materials Board.
Take into consideration Downtown Marana Overlay District guidelines – See separate Attachment ‘B’ Marana Overlay District Guidelines
Serve as a welcoming presence, acting as a gateway to Downtown Marana/Main Street.
Upon selection of the qualified artist by the Town, a design concept shall be developed in collaboration with Town Staff representatives, the selected artist, pre-selected local students, the local instructor, and Town of Marana Citizens’ Forum members, or any combination thereof.
The Town anticipates that the timeframe between artist submission of design proposals and award of contract may be lengthy, based upon the schedule of grant disbursement. The PAG TABY grant was awarded and disbursed in February 2019.
The Town anticipates that the timeframe for artist recruitment, concept design, construction, and installation to be as follows: artist recruitment phase - May 2019, design phase – June – July 2019, construction phase – August – September 2019, and the installation phase – September – October 2019. These timeframes are subject to change.
To learn more please read the full CALL FOR ARTISTS/REQUEST FOR QUALIFICATIONS (RFQ)